AS64502 · Starlight Servers, Inc.NOC +0 100 4 0000 (24h)Facilities 12 · Halls 46 · Regions 4Backbone status: nominal
Starlight Servers / Inc.

Network

Where the network physically is

Four regions, twelve buildings, 46 halls. Every figure below is the contracted one; installed capacity is higher and is not published. We own every facility on this list outright and have never listed a partner site.

Regions

Four regions

Region summary
RegionFacilitiesHallsRegional edgeIntra-region RTT
Central Plains517Kestrel Flats (KSF1)0.9 ms
North Atlantic312Longwater East (LWR2)1.4 ms
Pacific Rim210Grayling (GRY2)2.1 ms
Southern Reach27Verrin Sound (VRS1)3.6 ms
5 facilities · 17 halls

Central Plains

The oldest region and the densest. Five sites inside a 380 km triangle, every pair carried on at least three diverse paths. Most traffic on the network still passes through it.

3 facilities · 12 halls

North Atlantic

Cable-landing region. Five subsea systems, two of which we own outright; the remainder are IRU capacity on 25-year terms. Thule Reach is unstaffed for eleven days in twelve.

2 facilities · 10 halls

Pacific Rim

Highest growth, thinnest redundancy. Grayling and Pale Harbour are diverse on paper and share one 60 km duct section in practice; the remediation is funded and dated.

2 facilities · 7 halls

Southern Reach

Newest region. Both sites were built to one standard, with nothing acquired, and its change-failure figures show it.

Facilities

Facility register

Codes are the operational names and appear on tickets, invoices and requisitions. Numbering is historical; gaps in a sequence are not errors and are not annotated.

Twelve facilities · register current 2026-09-01
CodeFacilityRegionComm.Hallsm²MWFabricStatus
KSF1Kestrel Flats
Original site. Hall 1 retains the 1981 busway and is not sold.
Central Plains1981414,20047400GOperating
KSF3Kestrel Flats West
Two of six halls energised. Phase 2 handover Q3.
Central Plains202628,00030800GCommissioning
MRH1Marrow Hill
Legacy fabric. No new allocations; renewals honoured to 2034.
Central Plains199226,40018100GOperating
OST1Ostrow Line
Carrier hotel. 31 networks on-net at the meet-me.
Central Plains1997412,90040400GOperating
DNM1Dunmore Deep
Subsurface, 94 m. Groundwater loop; no evaporative draw.
Central Plains2022519,40070800GOperating
LWR1Longwater
Registered office. Cable landing 400 m south.
North Atlantic198639,80031400GOperating
LWR2Longwater East
Largest single-building footprint on the network.
North Atlantic2004521,60074800GOperating
THR1Thule Reach
Free cooling 341 days/yr. Crew rotations are fortnightly.
North Atlantic2012415,50061800GOperating
PLH1Pale Harbour
Four subsea systems terminate in the adjacent vault.
Pacific Rim2001310,30034400GOperating
GRY2Grayling
Hall count includes one hall not available for customer allocation.
Pacific Rim2009724,80088800GOperating
SBC1Sable Court
Two independent grid feeds, separate substations.
Southern Reach2014311,70042400GOperating
VRS1Verrin Sound
Wind-fed; 71% of annual draw contracted at source.
Southern Reach2019418,20066800GOperating
A single-storey windowless precast concrete building photographed at dusk from across an empty asphalt apron, behind a mesh fence topped with barbed wire. A bank of rooftop cooling units runs the length of the parapet. There is one grey personnel door, two wall lights, and no signage anywhere on the building.
LWR1 · Longwater. 1 Longwater Approach, North Atlantic Region. Commissioned 1986; three halls, 9,800 m², 31 MW contracted. North elevation from the visitor apron. The units on the roof are the mechanical plant. There is no sign because a sign brings deliveries and callers meant for someone else; people with business here are given the address and a gate code. This is also the registered office. Photographed 2026-02-19, 17:41 local.
Total halls46
Total technical white space172,800 m²
Total contracted load601 MW

Peering

Open policy, AS64502

We peer with anyone at a common exchange, settlement-free, with no ratio requirement and no minimum traffic volume. The policy was published in 1996 and has not been amended.

  • Minimum: one exchange in common, a maintained PeeringDB-equivalent record, and a 24-hour NOC.
  • We announce customer and internal prefixes only, RPKI-signed, no transit prefixes.
  • Requests to peering@starlightservers.net, answered within two working days.
  • We will depeer for prefix hijacking and for nothing else. There have been three.

Private interconnect inside any of our halls is a cross-connect, priced per connect per month, and is not conditioned on a transit purchase.

Exchange presence · 14 fabrics
FabricSiteCapacity
Kestrel ExchangeKSF1400G ×2
Kestrel Exchange SouthKSF1400G
Ostrow Meet-MeOST1400G ×4
Marrow Peering FabricMRH1100G
Dunmore FabricDNM1800G ×2
Longwater Internet ExchangeLWR1400G ×2
Longwater East FabricLWR2800G ×4
Thule Reach IXTHR1400G
Pale Harbour ExchangePLH1400G ×2
Grayling FabricGRY2800G ×4
Grayling Fabric (secondary)GRY2400G
Sable Court IXSBC1400G ×2
Verrin Sound FabricVRS1800G ×2
Southern Reach RegionalSBC1100G

Maintenance

Standing windows

Standing maintenance windows
RegionPrimaryReserveNotice
Central PlainsTue 02:00 – 06:00Wed 01:00 – 05:0010 working days
North AtlanticWed 01:00 – 05:00Thu 01:00 – 05:0010 working days
Pacific RimThu 15:00 – 19:00 UTCFri 15:00 – 19:00 UTC10 working days
Southern ReachTue 16:00 – 20:00 UTCWed 16:00 – 20:00 UTC10 working days

Planned work is notified ten working days ahead, with the expected impact and the rollback plan. Emergency work is notified when it starts.

Barrier ruleset promotions run weekly inside the reserve window and are not individually notified, as provided for in the service schedule. Ward threshold changes are not notified.

MRH1 legacy fabric. Read-only migration begins 2026-11-02. Renewals are honoured to 2034; no new allocations are being taken.