AS64502 · Starlight Servers, Inc.NOC +0 100 4 0000 (24h)Facilities 12 · Halls 46 · Regions 4Backbone status: nominal
Starlight Servers / Inc.

About

Forty-seven years of the same job

Starlight Servers owns and runs physical network infrastructure, and has done nothing else since 1979. We have not been acquired, have taken no outside capital, and hold no equity outside the people who work here.

Most of what we decided early is still in service. The 1981 busway at Kestrel Flats is energised, the 1996 peering policy has not been amended, and SL-7 can be instrumented the way Platform Defence asks because of a counter-plane decision taken in 1988.

Most of the industry treats what we do as a commodity and websites as the interesting part. Websites are weather. We are the ground.

Company

Incorporated
1979
Renamed
1991
Ownership
Private
Outside capital
None
Staff
3,117
Median tenure
9.2 yrs
Facilities
12
Registered office
LWR1

History

Dates that still matter operationally

Company record
YearEvent
1979Incorporated as Starlight Line & Conduit. Two employees and a licence to lay duct.
1981Kestrel Flats (KSF1) commissioned. Four halls, 6 MW, a building nobody else wanted.
1986Longwater (LWR1) commissioned. First cable landing 400 m south of the site.
1988First in-house forwarding silicon, SL-1. The merchant parts could not hold the table.
1991Renamed Starlight Servers, Inc. The conduit business is retained and still trades.
1994Commercial Intelligence desk opened at Longwater.
1996Open peering policy published. Unchanged since.
1997Ostrow Line (OST1) opened as a carrier hotel. Power becomes the binding constraint.
2001Pale Harbour (PLH1) commissioned; first Pacific Rim presence.
2004Longwater East (LWR2) commissioned. Still the largest single footprint on the network.
2009Grayling (GRY2) commissioned.
2012Thule Reach (THR1) commissioned. Free cooling 341 days a year.
2014Sable Court (SBC1) opens the Southern Reach region.
2019Verrin Sound (VRS1) commissioned; 71% of annual draw contracted at source.
2022Dunmore Deep (DNM1) commissioned, 94 m below grade.
2026Kestrel Flats West (KSF3) energises two of six halls.

People

Leadership

Every officer below except the founder was promoted internally. The facility access standard prohibits publishing photographs of operational staff, so there are none here.

Officers and functional heads
RoleNameNote
Founder (1979)E. StarlightNon-executive since 1991
Chief ExecutiveH. OduyaJoined 1998 as a hall technician
Chief Operating OfficerM. Ferreira-LundJoined 2006
Director, SiliconR. AnselmJoined 1994
Head of Platform DefenceK. VaiseyJoined 2011
Head of Incident CommandT. BrandhorstJoined 2003
Counsel, Regulatory & Lawful AccessA. StellenbachJoined 2016
Keeper, Retention & ArchiveJ. MirrenJoined 1989

How we work

Own it

Freehold or nothing

Every facility is owned outright, including the land, and in eleven places the field the backbone conduit crosses. We hold no leases on any building we operate.

Say the number

Published with the bad figures in

We publish availability measured at the busway, the two backbone spans running hotter than we would like, and the requisition we have reposted four times.

Write it down

The record outlives the engineer

In 2024 we brought up a 2009 part from its documentation, without its designer. Every block is documented to the standard that made that possible, and review enforces it.

Contact

Who to ask

Commercial
Colocation & transit salessales@starlightservers.net
Peeringpeering@starlightservers.net
Invoicingbilling@starlightservers.net
Recruitmentcareers@starlightservers.net
Operational
NOC, 24 hours+0 100 4 0000
Abuseabuse@starlightservers.net
Lawful access & ordersorders@starlightservers.net
Registered office1 Longwater Approach, North Atlantic Region

Service of legal process is accepted at the registered office and at orders@starlightservers.net. Orders are acknowledged inside the statutory clock; the register of orders received is maintained indefinitely.