About
Forty-seven years of the same job
Starlight Servers owns and runs physical network infrastructure, and has done nothing else since 1979. We have not been acquired, have taken no outside capital, and hold no equity outside the people who work here.
Most of what we decided early is still in service. The 1981 busway at Kestrel Flats is energised, the 1996 peering policy has not been amended, and SL-7 can be instrumented the way Platform Defence asks because of a counter-plane decision taken in 1988.
Most of the industry treats what we do as a commodity and websites as the interesting part. Websites are weather. We are the ground.
Company
- Incorporated
- 1979
- Renamed
- 1991
- Ownership
- Private
- Outside capital
- None
- Staff
- 3,117
- Median tenure
- 9.2 yrs
- Facilities
- 12
- Registered office
- LWR1
History
Dates that still matter operationally
| Year | Event |
|---|---|
| 1979 | Incorporated as Starlight Line & Conduit. Two employees and a licence to lay duct. |
| 1981 | Kestrel Flats (KSF1) commissioned. Four halls, 6 MW, a building nobody else wanted. |
| 1986 | Longwater (LWR1) commissioned. First cable landing 400 m south of the site. |
| 1988 | First in-house forwarding silicon, SL-1. The merchant parts could not hold the table. |
| 1991 | Renamed Starlight Servers, Inc. The conduit business is retained and still trades. |
| 1994 | Commercial Intelligence desk opened at Longwater. |
| 1996 | Open peering policy published. Unchanged since. |
| 1997 | Ostrow Line (OST1) opened as a carrier hotel. Power becomes the binding constraint. |
| 2001 | Pale Harbour (PLH1) commissioned; first Pacific Rim presence. |
| 2004 | Longwater East (LWR2) commissioned. Still the largest single footprint on the network. |
| 2009 | Grayling (GRY2) commissioned. |
| 2012 | Thule Reach (THR1) commissioned. Free cooling 341 days a year. |
| 2014 | Sable Court (SBC1) opens the Southern Reach region. |
| 2019 | Verrin Sound (VRS1) commissioned; 71% of annual draw contracted at source. |
| 2022 | Dunmore Deep (DNM1) commissioned, 94 m below grade. |
| 2026 | Kestrel Flats West (KSF3) energises two of six halls. |
People
Leadership
Every officer below except the founder was promoted internally. The facility access standard prohibits publishing photographs of operational staff, so there are none here.
| Role | Name | Note |
|---|---|---|
| Founder (1979) | E. Starlight | Non-executive since 1991 |
| Chief Executive | H. Oduya | Joined 1998 as a hall technician |
| Chief Operating Officer | M. Ferreira-Lund | Joined 2006 |
| Director, Silicon | R. Anselm | Joined 1994 |
| Head of Platform Defence | K. Vaisey | Joined 2011 |
| Head of Incident Command | T. Brandhorst | Joined 2003 |
| Counsel, Regulatory & Lawful Access | A. Stellenbach | Joined 2016 |
| Keeper, Retention & Archive | J. Mirren | Joined 1989 |
How we work
Freehold or nothing
Every facility is owned outright, including the land, and in eleven places the field the backbone conduit crosses. We hold no leases on any building we operate.
Published with the bad figures in
We publish availability measured at the busway, the two backbone spans running hotter than we would like, and the requisition we have reposted four times.
The record outlives the engineer
In 2024 we brought up a 2009 part from its documentation, without its designer. Every block is documented to the standard that made that possible, and review enforces it.
Contact
Who to ask
| Colocation & transit sales | sales@starlightservers.net |
|---|---|
| Peering | peering@starlightservers.net |
| Invoicing | billing@starlightservers.net |
| Recruitment | careers@starlightservers.net |
| NOC, 24 hours | +0 100 4 0000 |
|---|---|
| Abuse | abuse@starlightservers.net |
| Lawful access & orders | orders@starlightservers.net |
| Registered office | 1 Longwater Approach, North Atlantic Region |
Service of legal process is accepted at the registered office and at orders@starlightservers.net. Orders are acknowledged inside the statutory clock; the register of orders received is maintained indefinitely.